Lahore August 23, 2024: Today, a significant lecture place at Khanqah Sultan ul Ashiqeen in Sundar Sharif, Lahore, where a special lecture of Tableegh was conducted. The gathering drew a large number of disciples and followers, eager to gain spiritual insights and guidance. The Dars was led by a senior scholar Sultan Nasir Hameed, who delivered an inspiring lecture on the importance of spreading the message of Islam and living a life of righteousness. Attendees were encouraged to embody the principles of the faith in their daily lives and to actively participate in spreading the teachings of Islam to others. During…

Read More

Lahore August 13, 2024: Today, construction work at Masjid Zahra is continuing with steady progress. Supervisor of Masjid-e-Zahra Sultan Muhammad Naeem Abbas Sahib made a special visit to the construction site to oversee the ongoing activities. During his visit, he provided crucial instructions to the workers, ensuring that the project remains on track and that all tasks are being carried out to the highest standards. Assistant Supervisor Muhammad Ramzan Bahoo accompanied him, offering additional guidance and support during the site inspection. One of the key areas of focus today is the plastering work in the security room located next to…

Read More

Lahore August 09, 2024: Today, construction work is still going on in Masjid Zahra. Plaster work is going on at the security room next to the main gate. With this, the plaster work on the dome above the two gates will be completed. The filling of the ablution room of the mosque has been completed and the iron beam has been placed. The back wall with the graveyard next to the mosque has been completed and the side wall is being worked on today

Read More

Lahore August 09, 2024:  Today, construction at Masjid Zahra is moving forward at a brisk pace. The plaster work on the wall opposite the main gate has been completed, providing a polished and durable finish to the structure. Additionally, the plastering work on the dome structure at the main gate is in full swing, ensuring that the intricate details are carefully crafted. This stage of the construction is crucial for preparing the surface for the next steps, including the application of decorative elements. Simultaneously, the installation of golden tiles on the mosque’s roof is ongoing, adding a touch of elegance…

Read More

Lahore August 08, 2024: Today, construction work is going on rapidly in Masjid Zahra. Plaster work has been completed up to the other side along the main gate wall. Apart from this, the plastering work on the dome structure at the main gate is in progress. The work of golden tiles on the roof of the mosque is also going on and the lighting work is going on inside the Pak Mahal

Read More

Lahore August 07, 2024: The development of the toilets for Masjid-e-Zahra is gaining prominent headway. Brick work has likewise started, denoting a critical forward-moving step in the task’s timetable. In equal, the fundamental wall close to the mosque’s primary door is approaching fulfillment. The mortar work on this wall is effectively progressing, expecting to accomplish a smooth and strong completion. In the mean time, tile work on the mosque’s rooftop is going full speed ahead. The establishment of brilliant tiles on the subsequent vault is in progress, adding to the mosque’s stylish allure. These endeavors all in all add to…

Read More

Lahore August 06, 2024: The construction of the toilets for Masjid-e-Zahra is making notable progress, with the foundation laid today. The foundation work extends three feet below the soil, ensuring a sturdy base for the structure. Masonry work has also commenced, marking a significant step forward in the project’s timeline. In parallel, the main wall near the mosque’s main gate is nearing completion. The plaster work on this wall is actively ongoing, aiming to achieve a smooth and durable finish. Meanwhile, tile work on the mosque’s roof is in full swing. The installation of golden tiles on the second dome…

Read More

Lahore August 05, 2024: Today’s construction updates on Masjid-e-Zahra at Sundar Adda, Multan Road, Lahore, highlight significant progress. Golden tiles are being installed on the mosque’s roof, with the tiling work already completed on four domes. The installation of pinnacles on two domes has also been finished. Plaster work is being done on the wall next to the main gate and will continue for one week. The second dome of the main gate is nearing completion, while the structure of the first dome is already completed. Work on the graveyard wall continues, and the space between the mosque’s wall and…

Read More

Lahore August 04, 2024: The dome of the main gate of Masjid Zahra is being worked on. The first dome structure is near to complete. The minarets of the mosque are being tiled and the work will be completed soon. Plaster work is being done on the wall next to the main gate and the masonry of the graveyard wall is also being done. Plastering has also been completed on the gate pillar of the main road leading to the mosque. The dome structure over the main gate is nearly complete, showcasing exquisite craftsmanship. The mosque’s minarets are currently being tiled,…

Read More

Lahore August 02, 2024: The construction of the main gate of Masjid-e-Zahra is a key focus as the project nears completion. Designed to be both grand and welcoming, the gate features intricate Islamic motifs and calligraphy that reflect the mosque’s spiritual significance. The structure is being built with high-quality materials to ensure durability and aesthetic appeal. Once completed, the main gate will not only serve as a majestic entrance but also symbolize the rich cultural and religious heritage embodied by Masjid-e-Zahra.

Read More